PICTURED:  Installation of new cabinets

It was a whirlwind of progress and transition in the Bern Dining Hall from one weekend to the next here at Rocky Mountain (April 24-May 2). With the Maple floor installed the previous week, there was little time to get ready for a wedding only one weekend after Mennonite Quilters Retreat. Cabinets for the drink station needed to be installed along with putting the wood up on the walls to cover the electrical wiring and insulation improvements. With this work complete, the room then needed to be emptied of tool card, table saws, lumber, scaffolding, ladders and sawdust.

By Thursday, the preparation for the wedding began with much broom sweeping, much vacuuming and much dusting. With the cleaning complete, tables and chairs were moved in along with the portable sound system, making the Bern Dining Hall ready to offer the social hour between the wedding ceremony and reception.

Please visit the Rocky Mountain FaceBook and Instagram pages for additional posts and photos available on the Rocky Mountain FaceBook Album Page.

Finishing the walls

Clearing/cleaning up

Wedding day

Yet to be done:

  • Paint ceiling and rafter structure
  • Paint exterior doors
  • Sanding & finishing new Maple wood floor
  • Restoration of original windows & window trim
  • Install new interior and exterior lighting
  • install ceiling fans
  • Install counter top and sink for drink station
  • Install new built in sound system
  • Return tables, benches, table tennis table, foosball table, games & arts & crafts cabinets

How you can help?

Volunteer – Camp has had a great crew of “regulars” who have been instrumental in the progress achieved. Please consider joining in by visiting the RMMC Volunteer page to help us reach the finish line in time for the summer camping season!

Donate –  While camp has had a great crew of donor “regulars”, new and returning folks for this part of the Vision 2023 Capital Campaign (2021-2030) are needed! With a revised budget of $450k for the work and $200k received thus far, $250k is still needed. Please consider joining in to help us reach this financial “finish line” for the project via check or by visiting the RMMC Donate page.

  • Amount Received 45% 45%
PICTURED: Bern Dining Hall floor, walls, and cabinet installation.